CURRENT

Govt targets six waste-to-energy plants by 2021

3 Jul 2020, 8:44 AM
Govt targets six waste-to-energy plants by 2021

MELAKA, July 3 — The Ministry of Housing and Local Government aims to have at least six waste-to-energy (WTE) plants to be built nationwide by 2021.

Minister of Housing and Local Government Zuraida Kamaruddin said the WTE system is cleaner, more productive and economical than conventional landfill that requires a large area of land.

“We hope that every state will have one WTE plant as it does not need a large space or land area, which can be very costly.

“For a start, the only landfill that we will transform to adopt the WTE system is this Sungai Udang sanitary landfill,” she told reporters after visiting the landfill here today.

She said the pilot WTE plant project at the Sungai Udang landfill will then be followed by the implementation of the same system at the landfills in Bukit Payung, Terengganu; Seelong, Johor; Samling, Selangor and Jabor, Pahang.

The minister said the tender for the Sungai Udang project will open in September.

For the record, the Melaka government had reportedly planned to build RM3.6 million WTE plant on a 3.84-hectare site to address the problem of waste disposal in the state.

The WTE facility is expected to receive 1,000 tonnes of solid waste daily and is capable of producing up to 25-megawatt of green energy to provide electricity to 25,000 households around the area.

— Bernama

What do you think?

Latest
MidRec
Media Selangor
About Us

Media Selangor Sdn Bhd (MSSB), a subsidiary of Menteri Besar Selangor Incorporated (MBI), is the official media agency of the Selangor State Government. In addition to the Media Selangor news portal (formerly known as Selangorkini & Selangor Journal), Media Selangor also publishes newspapers in Mandarin, Tamil, and English.

Properties
MS: f922288e558c3b7b1d99bd47484377b4
EN: cd68e718a4d41dc8ef70c9d27c60e1f1
ZH: 100cdec69db9bc7fd9f175cab704a072
TA: 7b60ca9b9b7a9838dc33c5db6fb6f38c
TV-MS: 5c53513d790774360d169f98c36ce619